High-speed railway line from Heifei to Fuzhou – Mingan section Lot 3

Client MOR Ministry of Railway, China
Speed 350 km/h – ballast-less track
Total length 810 km
Planning period 2009 – 2011
Services Supervision
Completion 2010-2014

 

The planned section runs over 12.664 km on subgrade, 30.718 km on bridges (64 bridges) and on 58.363 km in tunnels (36 tunnels). Included are two railway stations.

 

Back