Projectname Category
Test line Sui-Yu-Line: Suining - Chongquing
Design consulting for ballast-less track in Chinese construction method.
Railway
High-speed railway line from Hefei to Nanjing – Girder consulting
Design consulting for optimization of the prefabricated single-span girders with 32 and 24 m span width.
Railway
Schnellbahnverbindung Hefei – Nanjing – Supervision consulting
Consulting, examination and training of on-site supervision for engineering structures, earthworks and superstructure as well as production of prefabricated single-span girders with 32 and 24 m span widths.
Railway
High-speed railway line from Beijing to Tianjin, Lot 1 Intercity Railway
Supervision bei der Ausführung. Beratung, Überprüfung und Schulung der site supervision für Ingenieurbauwerke, Erdbau und Oberbau.
Railway
High-speed railway line from Zhengzhou to Xian
Verification of serviceability of the viaducts’ superstructure for use of ballast-less track type Züblin.
Railway
High-speed railway line from Wuhan to Guangzhou Passenger Dedicated Line
Consulting, examination and training of on-site supervision for engineering structures, earthworks, tunnel construction and superstructures, track construction, overhead-cable and signalling technology as well ...
Railway
Technology transfer and Consulting for noise barriers on Chinese high-speed railway lines
Establishing of calculation manual in Chinese language.
Railway
High-speed railway line from Beijing to Shanghai, Nanjing Big Bridgem, Supervision
Supervision for work preparations, steel constructions at the plant and their execution
Railway
High-speed railway line from Beijing to Shanghai, Nanjing Big Bridgem, Supervision
Supervision for work preparations, steel constructions at the plant and their execution;
Railway
High-speed railway line from Beijing to Shanghai, Nanjing Big Bridge - Geological Supervision
The Nanjing Dashengguan Yangtze bridge is one of the main structures on the high-speed railway line from Beijing to Shanghai.
Railway
Ligne à grande vitesse de Chengdu à Dujiangyan
Optimization of prefabricated single-span girder system (32 m).
Railway
High-speed railway line from Nanning to Guangzhou - Yujiang Bridge, Nanning
The continuous steel truss girder is supported by stay cables in fan-like arrangement. Pylons are of reinforced concrete as hollow sections.
Railway
High-speed railway line from Beijing to Wuhan Passenger Dedicated Line
The applied system of ballast-less track is the Chinese Railway Track System 2, a development of the system Max Bögl used for the PDL Beijing – Tianjin.
Railway
High speed railway line from Changsha to Hangzhou – Zhejiang section Lot 1
The planned section between Hangzhou and East Yangxungiao runs completely over bridges, among them the superbridge over the Quianjiang River, length 1810 m. Included is the Hangzhou South Station.
Railway
High-speed railway line from Heifei to Fuzhou – Mingan section Lot3
The planned section runs over 12.664 km on subgrade, 30.718 km on bridges (64 bridges) and on 58.363 km in tunnels (36 tunnels). Included are two railway stations.
Railway